This large format postcard supplements National Grid’s annual pipeline awareness program (PPAP) baseline safety mailings. Directed to the affected public along rights-of-way near high-pressure natural gas transmission pipelines, it highlights 811 requirements and “Five steps for safe excavation.” A key message is that locating privately owned utilities beyond the meter is the property owner’s responsibility, and a colorful illustration clearly communicates which underground pipelines belong to National Grid and which belong to the property owner.

Audience: Affected public along the ROW

Region(s): All

Date published: October 2020

Project: 12404           Product: 97445

  Download PDF